Production Capacity Built for Brand Programs
From fabric receiving to export packing, our process is designed for consistent knitwear output and on-time shipment.
Capacity & Lead Time
| Production lines | 10 |
|---|---|
| Workers | 450 |
| Monthly output | About 300,000 pcs |
| Daily output | About 8,000 pcs |
| Minimum order | From 5,000 pcs |
| Lead time | About 26 days |
| Packing throughput | About 10,000–12,000 pcs / day |
| Finished goods storage | 200,000+ pcs capacity |
Process Flow
1
Fabric & trim receiving
Verification, unloading, 4-point fabric inspection, relaxation.
2
Cutting
Spreading, cutting, bundling/numbering, piece inspection.
3
Sewing
Pre-production prep, inline QC, assembly, endline QC.
4
Finishing & packing
Ironing, buttoning, recheck, thread clean, hangtag/fold, carton.
5
Final inspection & ship
Warehouse storage, AQL final inspection, export.
Machinery Highlights
Buyer-facing equipment counts from the factory profile.
Single needle: 141
4-thread overlock: 84
Cover stitch: 51 small · 6 large
Auto spreading: 2 · Auto cutting: 1
Heat press: 14
Ironing tables / steam irons: 20 / 20
Needle tester: 1
Fabric inspection: 2