Production Capacity Built for Brand Programs

From fabric receiving to export packing, our process is designed for consistent knitwear output and on-time shipment.

Capacity & Lead Time

Production lines10
Workers450
Monthly outputAbout 300,000 pcs
Daily outputAbout 8,000 pcs
Minimum orderFrom 5,000 pcs
Lead timeAbout 26 days
Packing throughputAbout 10,000–12,000 pcs / day
Finished goods storage200,000+ pcs capacity
Auto spreading and cutting capacity

Process Flow

1

Fabric & trim receiving

Verification, unloading, 4-point fabric inspection, relaxation.

2

Cutting

Spreading, cutting, bundling/numbering, piece inspection.

3

Sewing

Pre-production prep, inline QC, assembly, endline QC.

4

Finishing & packing

Ironing, buttoning, recheck, thread clean, hangtag/fold, carton.

5

Final inspection & ship

Warehouse storage, AQL final inspection, export.

Machinery Highlights

Buyer-facing equipment counts from the factory profile.

Single needle: 141
4-thread overlock: 84
Cover stitch: 51 small · 6 large
Auto spreading: 2 · Auto cutting: 1
Heat press: 14
Ironing tables / steam irons: 20 / 20
Needle tester: 1
Fabric inspection: 2
Packing and throughput
Finished goods warehouse capacity